SAP S/4HANA Transformation

SAP S/4HANA Upgrade

Release upgrades and Feature Package updates for your existing S/4HANA system – carefully planned, with no surprises in production.

Takeda
DocMorris
Trumpf
SEW-Eurodrive
Frosta
AlzChem
Playmobil
SKF

What sets an S/4HANA upgrade apart from an ECC migration

Once you're already running productively on SAP S/4HANA, you regularly face a different question than at the original SAP ECC migration: it's no longer about brownfield or greenfield, but about the planned release upgrade to a newer S/4HANA version, or applying Feature Package Stacks within the current release.

Technically, the Maintenance Planner determines the required software packages, while the Software Update Manager (SUM) 2.0 carries out the actual conversion – if needed, with the Zero Downtime Option to minimize downtime.

What companies need today

  • Planning certainty for the next necessary release upgrade
  • Minimal downtime during the technical upgrade
  • Early visibility into Simplification Items and custom code impacts
  • Adopting new innovations without uncontrolled configuration sprawl
  • A traceable test concept for critical processes after the upgrade
  • A partner who navigates confidently even if complications arise during the upgrade

What SERKEM delivers

  • Release and maintenance roadmap based on your current S/4HANA version
  • Planning via the Maintenance Planner, execution with SUM 2.0
  • Upfront review of Simplification Items and custom code compatibility
  • Use of the Zero Downtime Option wherever technically viable
  • Regression testing of business-critical processes after the upgrade
  • Hypercare support in the first weeks after the switch
SAP Maintenance Planner

The starting point of every upgrade

Based on your current system state, the Maintenance Planner determines all required software packages, add-ons, and the appropriate stack configuration file – the foundation for the Software Update Manager.

  • Determining download files for add-ons, packages, and DBDs
  • Checking the compatibility of installed add-ons with the target release
  • Generating the stack configuration file for SUM 2.0
  • The foundation for both release upgrades and Feature Package updates
Two hikers looking out over a valley from a summit, symbolizing the SAP S/4HANA upgrade

Feature Package Stack vs. Release Upgrade

Not every update is a major version jump – SAP distinguishes between two fundamentally different update types.

Within the year

Feature Package Stack Update

Smaller packages applied within the year, inside an existing S/4HANA release – without moving to the next major version.

  • Applying Support and Feature Package Stacks
  • No version jump to the next S/4HANA release
  • Generally a smaller scope of regression testing

Ideal when…

You want to stay on your current release but apply selective enhancements and bug fixes.

Multi-year

Release Upgrade

Moving to a new S/4HANA main release to stay within the maintenance window and adopt larger innovations.

  • Moving to a new S/4HANA release with an expanded feature set
  • More extensive review of Simplification Items
  • The Zero Downtime Option can significantly reduce technical downtime

Ideal when…

Your current release's end of maintenance is approaching, or you want to specifically adopt new innovations.

What gets checked before every upgrade

Careful preparation determines whether an upgrade goes smoothly.

Simplification Items

Reviewing all Simplification Items relevant to the target release and their impact on existing processes.

Custom Code Check

Analyzing custom developments for compatibility with the target release before the technical conversion.

Add-On Compatibility

Reconciling installed add-ons and industry solutions against the target release via the Maintenance Planner.

Zero Downtime Option

Assessing whether and to what extent technical downtime can be reduced for your upgrade scenario.

Consistently on the SAP standard

We carry out upgrades using the standard SAP tools Maintenance Planner and SUM 2.0 – no risky workarounds.

Rapid prototyping instead of concept slides

You see the effects of new innovations early in a test system – not only after the production upgrade.

Over 25 years of SAP experience

From maintenance planning to hypercare after the switch: we know the details that matter.

More on This Topic

News, real-world insights, and perspectives from our SAP experts. (German-language articles)

FAQ: SAP S/4HANA Upgrade

Answers to the most important questions about release upgrades and Feature Package updates.

A Feature Package Stack update applies Support and Feature Package Stacks within your current S/4HANA release, without moving to the next major version. A release upgrade, on the other hand, moves to a new S/4HANA release and typically brings a larger feature set along with a more extensive testing effort.

The Maintenance Planner determines the required software packages, add-ons, and stack configuration file based on your current system state. The Software Update Manager (SUM) 2.0 then carries out the technical conversion – for S/4HANA releases based on SAP BASIS 7.50 or higher.

The Zero Downtime Option is a feature of the Software Update Manager designed to carry out release upgrades and Feature/Support Package Stack updates without technical downtime. Whether and to what extent it can be used depends on your individual system environment and is assessed as part of upgrade preparation.

Simplification Items document changes to data structures, functions, or processes between SAP releases that can affect existing configuration or custom code. Before every release upgrade, the Simplification Items relevant to your system are reviewed to identify any need for adjustments early on.

SAP regularly releases new S/4HANA versions, each with its own maintenance window. To stay within mainstream maintenance, a release upgrade is necessary at certain intervals – within the year, you can also apply Feature Package Stacks without moving to the next major release.

Yes. Custom developments are checked for compatibility with the target release before an upgrade, particularly in connection with relevant Simplification Items. This review is a standard part of careful upgrade preparation.

Ready for the next step on your S/4HANA roadmap?

SERKEM plans your release roadmap, reviews Simplification Items and custom code, and supports you through the technical upgrade all the way to hypercare.