SAP End of Support: All maintenance deadlines at a glance
SAP ECC, S/4HANA releases, EWM, PI/PO, BW, and Compatibility Packs don't all expire at once – but many are closer than they first appear. This overview shows mainstream and extended maintenance dates by product, with source and a concrete recommendation for action.
SAP distinguishes between Mainstream Maintenance (included in the maintenance contract, with the full scope of bug fixes and support), Extended Maintenance (optional, fee-based, typically limited to two years), and Customer-Specific Maintenance (an individual agreement with no fixed end date and no contractual entitlement). Once all three stages have expired, a system remains technically operational but no longer receives security patches, legal-change packages, or SAP support – a state no production system should be left in.
SAP ERP 6.0 / SAP ECC (Business Suite 7)
The classic ECC core system makes up the largest share of the installed base – and the area under the most time pressure.
| Release | Mainstream end | Extended maintenance | Reference | Status |
|---|---|---|---|---|
| SAP ERP 6.0 EHP 0–5 | already ended | ended 12/31/2025 → Customer-Specific Maintenance only from then on (individual agreement, fee-based, no fixed end date) | SAP Note 2881788 | Expired |
| SAP ERP 6.0 EHP 6–8 (ECC) | 12/31/2027 | 12/31/2030 (optional, fee-based) | SAP Note 2881788 | Expiring |
SAP S/4HANA On-Premise
S/4HANA installations aren't maintained indefinitely either – early on-premise releases expire much sooner than the product line's overall 2040 commitment might suggest.
| Release | Mainstream end | Extended maintenance | Reference | Status |
|---|---|---|---|---|
| S/4HANA On-Premise 2021 / 2022 / 2023 | October 2026 | optionally extendable by roughly 2 years (fee-based) – confirm the exact deadline per release in the PAM | SAP PAM | Critical |
Compatibility Scope & Compatibility Packs
Compatibility Packs allow the time-limited continued use of ECC functionality for which S/4HANA doesn't (yet) offer a full standard solution. Most usage rights have already expired.
| Area | Usage-right end | Exception / extension | Reference | Status |
|---|---|---|---|---|
| Compatibility Packs S/4HANA On-Premise (general) | 05/31/2026 (already expired) | – | SAP Note 2269324 | Expired |
| Exceptions: CS, LE-TRA, PP-PI (as well as RISE/Private Cloud) | – | extended through 12/31/2030 | SAP Note 2269324 | Extended |
| SAP WM / LE-WM on S/4HANA (Compatibility Scope) | 12/31/2025 (expired – license violation since 01/01/2026) | – | SAP Note 2269324 | Expired |
Integration & Analytics (NetWeaver Stack)
SAP PI/PO and SAP BW 7.5 run technologically on the same NetWeaver maintenance cycle – both reach the end of mainstream maintenance on the same date.
| Product | Mainstream end | Extended maintenance | Reference | Status |
|---|---|---|---|---|
| SAP Process Integration / Process Orchestration (PI/PO) 7.5 | 12/31/2027 | 12/31/2030 (optional, fee-based) | SAP Note 1648480 | Expiring |
| SAP BW 7.5 | 12/31/2027 | 12/31/2030 (optional, fee-based) | SAP Note 1648480 | Expiring |
SAP Warehouse Management & the EWM Family
Warehouse logistics is the most fragmented area: classic WM, standalone EWM at several release levels, and the strategically favored embedded/decentralized EWM on S/4HANA all run in parallel with very different deadlines.
| Product / release | Mainstream end | Extended maintenance | Reference | Status |
|---|---|---|---|---|
| SAP WM / LE-WM (on ECC) | 12/31/2027 | 12/31/2030 (aligned with ECC EHP 6–8, optional) | SAP Note 2881788 | Expiring |
| SAP EWM 9.1 / 9.2 | already expired 12/31/2020 | no regular extension available anymore | SAP Note 2911449 | Expired |
| SAP EWM 9.4 (Standalone/SCM) | already expired 12/31/2025 | Customer-Specific Maintenance only (individual agreement) | SAP Note 2911449 | Expired |
| SAP EWM 9.0 / 9.3 | 12/31/2027 | expected through 2029 (SAP standard model, individual confirmation recommended) | SAP Note 2911449 | Expiring |
| SAP EWM 9.5 (Standalone / SCM-based) | 12/31/2027 | 12/31/2030 (optional, fee-based) | SAP Note 1648480 | Expiring |
| SAP Fiori for SAP EWM 1.0 | 12/31/2027 | expected through 2030 (aligned with EWM 9.5) | SAP Note 2911449 | Expiring |
| EWM on SAP S/4HANA (Embedded / Decentralized) | active – no expiration | maintenance commitment through 2040 | SAP Note 3376453 / 3376455 | Active |
SAP Plant Connectivity (PCo), SAP MII & SAP ME
PCo rarely appears in classic end-of-support lists because it has no maintenance date of its own – it hangs off the NetWeaver-based MII/ME stack and expires in sync with it. If you connect conveyor systems, machinery, or MES interfaces via PCo, this date still deserves your attention.
| Phase | Date | Note |
|---|---|---|
| End of Mainstream Maintenance | 12/31/2027 | Applies jointly to SAP MII, SAP ME, and SAP PCo as part of the NetWeaver stack |
| Extended Support (fee-based) | approx. 12/31/2030 | Premium maintenance available, but no new features or roadmap entries |
| Hard Sunset / End of Life | after 2030 | No more support, no security patches, no functional updates |
Recommendation
What these deadlines mean for you
An expiring maintenance window isn't a reason for panic, but it is a reliable trigger for a planning decision. SAP's official maintenance strategy and the Product Availability Matrix (PAM) are the binding source for that – the recommendations below translate the deadlines into concrete next steps.
ECC & S/4HANA On-Premise
Schedule your migration project now
With mainstream maintenance ending in October 2026, there's barely any lead time left for an S/4HANA upgrade or conversion project. SERKEM assesses your system landscape, plans a brownfield or greenfield approach, and supports the implementation.
View S/4HANA TransformationWM & the EWM Family
Move to embedded or decentralized EWM
Classic WM and standalone EWM all expire by 2027–2030 at the latest. Embedded or decentralized EWM on S/4HANA is the only warehouse logistics option with a maintenance commitment through 2040.
View migration to SAP EWMSAP PI/PO
Migrate to the SAP Integration Suite
PI/PO reaches the end of mainstream maintenance in 2027. The SAP Integration Suite on BTP is the strategic target platform – running both in parallel during the migration is explicitly supported.
View migration from PI/POPCo, MII & ME
Replace your MES/connectivity layer in time
Conveyor and machine connections via PCo often grow organically and are hard to inventory. A structured replacement before the hard sunset after 2030 avoids time pressure once you're already in operation.
View legacy system replacementNews, real-world insights, and perspectives from our SAP experts. (German-language articles)
Frequently Asked Questions
FAQ on SAP maintenance deadlines
Terms and context around Mainstream Maintenance, Extended Maintenance, and Customer-Specific Maintenance.
Mainstream Maintenance is included in the regular maintenance contract and covers full support, bug fixes, security patches, and legal changes. Extended Maintenance is an optional, fee-based extension – usually two years, at a percentage surcharge on the maintenance fee. It continues to provide patches and support, but without new features or roadmap entries.
Customer-Specific Maintenance applies once neither Mainstream nor Extended Maintenance is available anymore. It's an individual, fee-based agreement with SAP with no fixed scope and no contractual entitlement to specific fixes. CSM buys time, but it doesn't replace a migration decision.
The system keeps running technically, but no longer receives security patches, legal-change packages (e.g. for new statutory reporting obligations), or official SAP support. With Compatibility Packs there's an additional licensing risk: using them after the usage right has expired is contractually a license violation, regardless of whether the system keeps running technically.
As a rule of thumb: the system analysis should be complete and the migration approach (brownfield, greenfield, or selective data transition) decided 18–24 months before the relevant maintenance deadline. Where a deadline is only a few months out – as is currently the case for S/4HANA On-Premise 2021–2023 – planning should start immediately, partly to deliberately use Extended Maintenance as a time buffer.
Need clarity on the maintenance deadlines for your system landscape?
We compare your installed base against the current SAP maintenance calendar, prioritize the critical deadlines, and develop a realistic migration roadmap.